asbestos problem manchester
asbestos tile removal manchester

Project: Removal of asbestos containing floor tiles and adhesive from a dwelling for a homeowner prior to re-furbishment works

Description: Operatives carried out the safe removal of all asbestos containing materials from a house in Hyde, Tameside, which included all H&S Procedures being adhered to at all times.

Timescale: 3 days.